Electric Power System Planning with Explicit Stochastic Reserves Constraint
Charles R. Scherer and
Leland Joe
Additional contact information
Charles R. Scherer: University of California, Los Angeles
Leland Joe: University of California, Los Angeles
Management Science, 1977, vol. 23, issue 9, 978-985
Abstract:
The problem of optimal planning of an electric power system is formulated as a cost minimizing mixed-integer mathematical program. The model emphasizes system reliability, requiring reserve generating capacity such that a Loss of Load Probability criterion of one day in ten years is met. Integer variables are used in the model to express system reliability explicitly as a constraint on the system model. Results are given for several plant outage rates and demand levels. The results show that the reliability and "rule-of-thumb" approaches to system reserve planning can yield substantially different optimal system costs and configurations.
Date: 1977
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.23.9.978 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:23:y:1977:i:9:p:978-985
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().