Minimising the Maximum Penalty in the Two-Machine Flow Shop
W. Townsend
Additional contact information
W. Townsend: Leed Polytechnic, England
Management Science, 1977, vol. 24, issue 2, 230-234
Abstract:
It is shown how Lawler's procedure for the one-machine case can be combined with Johnson's rule to produce a branch-and-bound algorithm for the two-machine version.