Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
Steve Phillips, Jr. and
Mohamed I. Dessouky
Additional contact information
Steve Phillips, Jr.: University of South Florida
Mohamed I. Dessouky: University of Illinois, Urbana
Management Science, 1977, vol. 24, issue 4, 393-400
Abstract:
This paper introduces a solution procedure for solving the project time/cost tradeoff problem of reducing a project duration at a minimum cost. The solution to the time/cost problem is achieved by locating a minimal cut in a flow network derived from the original project network. This minimal cut is then utilized to identify the project activities which should experience a duration modification in order to achieve the total project reduction. The paper will document this cut-based procedure and provide a practical application to a project situation.
Date: 1977
References: Add references at CitEc
Citations: View citations in EconPapers (12)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.24.4.393 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:24:y:1977:i:4:p:393-400
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().