Note---On "A New Look at Production Switching Heuristics for the Aggregate Planning Problem"
Roger C. Vergin
Additional contact information
Roger C. Vergin: Simon Fraser University
Management Science, 1980, vol. 26, issue 11, 1185-1186
Abstract:
Several papers have been published which present simplified models for the aggregate planning problem which do not yield optimal schedules. They are typically supported with computations that suggest that the resulting schedules produce costs within a few percent of optimum. This note suggests that those cost comparisons have been made against inappropriate base costs which include a large fixed cost element. When these models are compared using only the controllable variable costs, costs that appeared to be only one or two percent over minimum turn out to be as much as twenty to thirty percent over the costs resulting from optimal solutions.
Keywords: planning; inventory/production: production smoothing (search for similar items in EconPapers)
Date: 1980
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.26.11.1185 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:26:y:1980:i:11:p:1185-1186
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().