Design of a Receivable Collection System: Sequential Building Heuristics
Bernell K. Stone
Additional contact information
Bernell K. Stone: Georgia Institute of Technology
Management Science, 1981, vol. 27, issue 8, 866-880
Abstract:
This paper extends previous work on the use of sequential building heuristics for the design of a collection system, a linear fixed-charge problem that includes the design of a lock-box system as an important subproblem. The heuristic extensions in this paper first present simple methods for eliminating "premature termination" (stopping the heuristics while there are still worthwhile alternatives not included in the collection system) and unprofitable inclusion (including collection alternatives with net benefits less than the fixed cost). Initiation procedures that increase computational efficiency and reduce the likelihood of significant suboptimization are presented. Finally, the simple one-at-a-time building procedure is extended to include joint exclusion-building (a limited switching plus building) and combination switching-building rules that consider combinations of alternatives rather than one-at-a-time evaluation.
Keywords: assignment-location problem; collection system design; lock box selection (search for similar items in EconPapers)
Date: 1981
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.27.8.866 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:27:y:1981:i:8:p:866-880
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().