Note---On Anomalies in Dynamic Ratio Type Scheduling Rules: A Clarifying Analysis
John J. Kanet
Additional contact information
John J. Kanet: University of Georgia
Management Science, 1982, vol. 28, issue 11, 1337-1341
Abstract:
Previous authors have shown that dynamic ratio scheduling rules do not always behave as intended. A recent proposal by Adam and Surkis (Adam, N. R., J. Surkis. 1980. Priority update intervals and anomalies in dynamic ratio type job shop scheduling rules. Management Sci. 26 (12, December) 1227--1237.) to correct such anomalies is shown to be in error. The reason why such anomalies occur is clarified and a rule which prevents such anomalies is presented.
Keywords: simulation: applications; production/scheduling: job shop; deterministic; queues: priority (search for similar items in EconPapers)
Date: 1982
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.28.11.1337 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:28:y:1982:i:11:p:1337-1341
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().