Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
Suresh Chand
Additional contact information
Suresh Chand: Purdue University
Management Science, 1983, vol. 29, issue 2, 237-249
Abstract:
This paper develops rolling horizon procedures for solving a multistage inventory problem with facilities-in-series. In such an inventory system, we assume that the raw material is processed successively through several facilities before reaching the customer. The input to a facility comes from one preceding facility (or the raw material) and the output from the facility goes to one succeeding facility (or the customer). The rolling horizon procedures form rolling production schedules by solving a finite horizon multiperiod problem and implementing only the first period's decisions. One period later, the multiperiod problem is updated as better forecasts become available and the process is repeated. The paper considers a simple case when holding costs are linear, production costs on a facility consist of a setup cost and a constant marginal cost of production, and production and holding costs are stationary in time. Demand is allowed to be nonstationary in time. Several rolling horizon procedures are developed for this case and a computational comparison is given.
Keywords: inventory/production: planning horizons; production scheduling (search for similar items in EconPapers)
Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.29.2.237 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:29:y:1983:i:2:p:237-249
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().