Production Planning in Assembly Line Systems
R. Chandrasekaran,
Y. P. Aneja and
K. P. K. Nair
Additional contact information
R. Chandrasekaran: School of Business, University of Texas, Richardson, Texas 75275
Y. P. Aneja: Faculty of Administration, University of New Brunswick, Fredericton, New Brunswick, Canada E3B 6E5
K. P. K. Nair: Faculty of Administration, University of New Brunswick, Fredericton, New Brunswick, Canada E3B 6E5
Management Science, 1984, vol. 30, issue 6, 713-719
Abstract:
We develop a production planning model in the context of a system of assembly lines or production lines. The model is a large-scale linear program and we provide a polynomial column generation technique for its efficient solution. The column generation technique and the approach therein are also of interest in certain other problems. A numerical example to illustrate the algorithm is included. Finally computational experience with the algorithm is summarized.
Keywords: production/scheduling: flow Shop; programming: linear; production/scheduling: line balancing (search for similar items in EconPapers)
Date: 1984
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.30.6.713 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:30:y:1984:i:6:p:713-719
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().