A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"
Wieslaw Kubiak and
Suresh Sethi
Additional contact information
Wieslaw Kubiak: Faculty of Management, University of Toronto, Toronto, Ontario, Canada M5S 1V4
Management Science, 1991, vol. 37, issue 1, 121-122
Abstract:
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and heuristics were proposed for its solution. Our assignment formulation can also be extended to more general objective functions than the one used by Miltenburg.
Keywords: production/scheduling: mixed-model assembly lines; just-in-time; programming: nonlinear integer; assignment problem (search for similar items in EconPapers)
Date: 1991
References: Add references at CitEc
Citations: View citations in EconPapers (26)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.37.1.121 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:37:y:1991:i:1:p:121-122
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().