EconPapers    
Economics at your fingertips  
 

An Integrated Model for Job-Shop Planning and Scheduling

J. B. Lasserre
Additional contact information
J. B. Lasserre: LAAS-CNRS, 7 Avenue du Colonel Roche, 31077 Toulouse Cedex, France

Management Science, 1992, vol. 38, issue 8, 1201-1211

Abstract: We consider an integrated job-shop planning and scheduling model. To solve the problem we use a (multi-pass) decomposition approach which alternates between solving a planning problem with a fixed sequence of products on the machines, and a job-shop scheduling problem for a fixed choice of the production plan. The generated production plans are feasible i.e., there exists at least one feasible schedule to realize that plan. Quality of the solution is investigated and numerical results are presented.

Keywords: production planning; job-shop scheduling; mixed integer programming (search for similar items in EconPapers)
Date: 1992
References: Add references at CitEc
Citations: View citations in EconPapers (14)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.38.8.1201 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:38:y:1992:i:8:p:1201-1211

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:38:y:1992:i:8:p:1201-1211