Solving Airline Crew Scheduling Problems by Branch-and-Cut
Karla L. Hoffman and
Manfred Padberg
Additional contact information
Karla L. Hoffman: Operations Research Department, George Mason University, 4400 University Drive, Fairfax, Virginia 22030
Manfred Padberg: New York University, MEC 8-68, New York, New York 10012
Management Science, 1993, vol. 39, issue 6, 657-682
Abstract:
The crew scheduling problem is one that has been studied almost continually for the past 40 years but all prior approaches have always approximated the problem of finding an optimal schedule for even the smallest of an airline's fleets. The problem is especially important today since costs for flying personnel of major U.S. carriers have grown and now often exceed $1.3 billion a year and are the second largest item (next to fuel cost) of the total operating cost of major U.S. carriers. Thus even small percentage savings amount to substantial dollar amounts. We present a branch-and-cut approach to solving to proven optimality large set partitioning problems arising within the airline industry. We first provide some background related to this important application and then describe the approach for solving representative problems in this problem class. The branch-and-cut solver generates cutting planes based on the underlying structure of the polytope defined by the convex hull of the feasible integer points and incorporates these cuts into a tree-search algorithm that uses automatic reformulation procedures, heuristics and linear programming technology to assist in the solution. Numerical experiments are reported for a sample of 68 large-scale real-world crew scheduling problems. These problems include both pure set partitioning problems and set partitioning problems with side constraints. These "base constraints" represent contractual labor requirements and have heretofore not been represented explicitly in the construction of crew schedules thus making it impossible to provide any measure of how far the obtained solution was from optimality. An interesting result of obtaining less costly schedules is that the crews themselves are happier with the schedules because they spend more of their duty time flying than waiting on the ground.
Keywords: zero-one programming; set partitioning; crew scheduling; polyhedral cuts; preprocessing; heuristics; automatic reformulation; branch-and-cut; scientific computation (search for similar items in EconPapers)
Date: 1993
References: Add references at CitEc
Citations: View citations in EconPapers (102)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.39.6.657 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:39:y:1993:i:6:p:657-682
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().