EconPapers    
Economics at your fingertips  
 

Maximizing the Effectiveness of a Preventive Maintenance System: An Adaptive Modeling Approach

Mohan Gopalakrishnan, Sanjay L. Ahire and David M. Miller
Additional contact information
Mohan Gopalakrishnan: Department of Decision Sciences & MIS, Concordia University, 1455 de Maisonneuve Blvd. W, Montreal, PQ H3G 1M8, Canada
Sanjay L. Ahire: Department of Management, Haworth College of Business, Western Michigan University, Kalamazoo, Michigan 49008
David M. Miller: Department of Management Science and Statistics, Alabama Productivity Center, The University of Alabama, P.O. Box 870318, Tuscaloosa, Alabama 35487

Management Science, 1997, vol. 43, issue 6, 827-840

Abstract: The dynamic nature of an operating environment, such as machine utilization and breakdown frequency results in changing preventive maintenance (PM) needs for manufacturing equipment. In this paper, we present an approach to generate an adaptive PM schedule which maximizes the net savings from PM subject to workforce constraints. The approach consists of two components: (a) task prioritization based on a multi-logit regression model for each type of PM task, and (b) task rescheduling based on a binary integer programming (BIP) model with constraints on single-skilled and multi-skilled workforce availability. The task prioritization component develops a multi-logit regression for machine failure probability associated with each type of PM task at the beginning of the year, using historical data on machine utilization, PM, and machine breakdowns. At the start of each PM time-bucket (e.g., a month), we use the updated machine failure probability for each candidate PM task to compute its current contribution to net PM savings, which indicates its current priority. The task rescheduling BIP model incorporates the priorities in selecting tasks for the current bucket to maximize PM effectiveness subject to workforce availability, yielding an adaptive and effective PM schedule for each time-bucket of the master PM schedule. We examine the effect of using multi-skilled workforce on the overall PM effectiveness, and also provide an illustration from a newspaper publishing environment to explain the use of the approach. We have developed four heuristic algorithms to yield good solutions to large scale versions of this scheduling problem. The heuristics perform extremely well, and the best heuristic solution is within 1.4% of optimality on an average.

Keywords: preventive maintenance; multi-logit regression; binary integer programming (search for similar items in EconPapers)
Date: 1997
References: Add references at CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.43.6.827 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:43:y:1997:i:6:p:827-840

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:43:y:1997:i:6:p:827-840