EconPapers    
Economics at your fingertips  
 

A Practical Scheduling Method for Multiclass Production Systems with Setups

Tava Lennon Olsen
Additional contact information
Tava Lennon Olsen: Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, Michigan 48109-2117

Management Science, 1999, vol. 45, issue 1, 116-130

Abstract: Consider a multiclass production system where many job classes share a single server and a setup time is incurred whenever the server changes class. This paper presents a simple method for scheduling these systems that performs well, not only with respect to mean waiting time, but also with respect to waiting-time variance and the outer percentiles of waiting time. The scheduling method is dynamic and uses the ages of items in each queue, as well as the queue statistics, to decide which queue to service next.

Keywords: heuristics; changeovers; queueing; polling; manufacturing (search for similar items in EconPapers)
Date: 1999
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.45.1.116 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:45:y:1999:i:1:p:116-130

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:45:y:1999:i:1:p:116-130