The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System
Awi Federgruen and
Ziv Katalan
Additional contact information
Awi Federgruen: Graduate School of Business, Columbia University, New York, New York 10027
Ziv Katalan: The Wharton School, University of Pennsylvania, Philadelphia, Pennsylvania 19104
Management Science, 1999, vol. 45, issue 7, 980-994
Abstract:
Stochastic Economic Lot Scheduling Problems (ELSPs) involve settings where several items need to be produced in a common facility with limited capacity, under significant uncertainty regarding demands, unit production times, setup times, or combinations thereof. We consider systems where some products are made-to-stock while another product line is made-to-order. We present a rich and effective class of strategies for which a variety of cost and performance measures can be evaluated and optimized efficiently by analytical methods. These include inventory level and waiting-time distributions, as well as average setup, holding, and backlogging costs. We also characterize how strategy choices are affected by the system parameters. The availability of efficient analytical evaluation and optimization methods permits us to address the impact of product line diversification or standardization on the performance of the manufacturing system, in particular the logistical implications of adding low-volume specialized models to a given make-to-stock product line.
Keywords: performance/productivity manufacturing; queues; priorities; inventory/production; multi-item (search for similar items in EconPapers)
Date: 1999
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (25)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.45.7.980 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:45:y:1999:i:7:p:980-994
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().