EconPapers    
Economics at your fingertips  
 

Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand

Ramesh Bollapragada (), Uday S. Rao () and Jun Zhang ()
Additional contact information
Ramesh Bollapragada: College of Business, San Francisco State University, San Francisco, California 94132, and Bell Laboratories, Lucent Technologies, Holmdel, New Jersey 07733
Uday S. Rao: College of Business, University of Cincinnati, Cincinnati, Ohio 45221
Jun Zhang: A. B. Freeman School of Business, Tulane University, New Orleans, Louisiana 70118

Management Science, 2004, vol. 50, issue 12, 1729-1743

Abstract: We consider stock positioning in a pure assembly system controlled using installation base-stock policies. When component suppliers have random capacity and end-product demand is uncertain, we characterize the system's inventory dynamics. We show that components and the end product play convex complementary roles in providing customer service. We propose a decomposition approach that uses an internal service level to independently determine near-optimal stock levels for each component. Compared with the optimal, the average error of the decomposition approach is 0.66% across the tested instances. Compared with current practice, this approach has the potential to reduce the safety-stock cost by as much as 30%. Our computational analysis on two-echelon systems also illustrates several managerial insights: We observe that the cost reduction from improving supply performance is high when demand variability or the number of components or target customer service is high, or when the end product is more expensive relative to components. On average, (i) reducing the lead time of the more expensive component yielded higher benefit than reducing the lead time for the less expensive component, and (ii) the benefit of improving one of the supply parameters (service level or lead time) was higher when the value of the other parameter was already more favorable (lower lead time or higher service level, respectively). Finally, we analytically show how a multi-echelon pure assembly system may be converted into an equivalent two-echelon assembly system to which all our results apply.

Keywords: assembly system; installation base-stock policy; external and internal service levels; uncertainty; decomposition approach (search for similar items in EconPapers)
Date: 2004
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (27)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.1040.0314 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:50:y:2004:i:12:p:1729-1743

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:50:y:2004:i:12:p:1729-1743