EconPapers    
Economics at your fingertips  
 

Management Control for Market Transactions: The Relation Between Transaction Characteristics, Incomplete Contract Design, and Subsequent Performance

Shannon W. Anderson () and Henri Dekker
Additional contact information
Shannon W. Anderson: Jesse H. Jones Graduate School of Management, Rice University, Room 239--MS531, 6100 Main Street, Houston, Texas 77005-1892, and Department of Accounting and Business Information Systems, University of Melbourne, Melbourne, Australia

Management Science, 2005, vol. 51, issue 12, 1734-1752

Abstract: Using an unusually comprehensive database on 858 transactions for information technology products and accompanying services, we study how close partners who are exposed to opportunistic hazards structure and control a significant transaction. We analyze data on the terms of contracting to determine whether transaction and supplier characteristics that generate opportunistic hazards are related to the formal management control structure. We also examine whether misalignment between transaction and supplier characteristics and the control structure is associated with ex post performance problems. Characteristics associated with hazards are found to be positively related to contract extensiveness. Factor analysis of the use of 24 contract terms reveals four groups of contract terms that are commonly used in combination. We interpret these factors as "dimensions of management control" and label them: assignment of rights, product and price, after-sales service, and legal recourse. Characteristics associated with hazards are positively related to the use of all four dimensions of management control, with different hazards associated with different controls. We then examine the relation between transaction characteristics and ex post transaction problems, demonstrating that even in the presence of mutually agreeable contracts, hazards remain. We conclude that costs of contracting are associated with increased use of contract terms on assignment of rights, after-sales service, and legal recourse. Finally, we present evidence that management control structures that are better aligned with transaction hazards mitigate subsequent performance problems, though at a nontrivial cost of contracting.

Keywords: management control; contingency theory; transaction costs; costs of contracting; information technology (search for similar items in EconPapers)
Date: 2005
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (60)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.1050.0456 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:51:y:2005:i:12:p:1734-1752

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:51:y:2005:i:12:p:1734-1752