A Structural Method of Computing Project Cost Polygons

William Prager
Additional contact information
William Prager: Brown University, Providence, Rhode Island

Management Science, 1963, vol. 9, issue 3, 394-404

Abstract: For a project that consists of numerous jobs subject to technological ordering restrictions the polygon representing project cost versus completion time is to be determined when the normal and crash completion times are known for each job and the cost of doing the job varies linearly between these times. A linear programming formulation of this problem was given by Kelley [Kelley, J. E., Jr. 1961. Critical-path planning and scheduling: Mathematical basis. Oper. Res. 9 296-320.] and a network flow formulation by Fulkerson [Fulkerson, D. R. 1961. A network flow computation for project cost curves. Management Sci. 7 (2, January) 167-178.]. Since the traditional mathematical background of civil engineers includes neither linear programming nor network flow theory, these methods are not as widely used in the building industry as they deserve. This paper shows that Fulkerson's algorithm can be given a structural interpretation using concepts that are familiar to civil engineers.

Date: 1963
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.9.3.394 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:9:y:1963:i:3:p:394-404

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:9:y:1963:i:3:p:394-404