Sequencing Appointments for Service Systems Using Inventory Approximations
Ho-Yin Mak (),
Ying Rong () and
Jiawei Zhang ()
Additional contact information
Ho-Yin Mak: Department of Industrial Engineering and Logistics Management, The Hong Kong University of Science and Technology, Kowloon, Hong Kong
Ying Rong: Antai College of Economics and Management, Shanghai Jiao Tong University, 200052 Shanghai, China
Jiawei Zhang: Department of Information, Operations, and Management Sciences, Stern School of Business, New York University, New York 10012, New York
Manufacturing & Service Operations Management, 2014, vol. 16, issue 2, 251-262
Abstract:
Managing appointments for service systems with random job durations is a challenging task. We consider a class of appointment planning problems that involve two sets of decisions: job sequencing , i.e., determining the order in which a list of jobs should be performed by the server, and appointment scheduling , i.e., planning the starting times for jobs. These decisions are interconnected because their joint goal is to minimize the expected server idle time and job late-start penalty costs incurred because of randomness in job durations. In this paper, we design new heuristics for sequencing appointments. The idea behind the development of these heuristics is the structural connection between such appointment scheduling problems and stochastic inventory control in serial supply chains. In particular, the decision of determining time allowances as buffers against random job durations is analogous to that of selecting inventory levels as buffers to accommodate random demand in a supply chain; having excess buffers in appointment scheduling and supply chain settings incurs idle time and excess inventory holding costs, respectively, and having inadequate buffers leads to delays of subsequent jobs and backorders, respectively. Recognizing this connection, we propose tractable approximations for the job sequencing problem, obtain several insights, and further develop a very simple sequencing rule of ordering jobs by duration variance to late-start penalty cost ratio. Computational results show that our proposed heuristics produce close-to-optimal job sequences with significantly reduced computation times compared with those produced using an exact mixed-integer stochastic programming formulation based on the sample-average approximation approach.
Keywords: appointment scheduling; service operations; stochastic inventory control; serial supply chains; stochastic programming (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (23)
Downloads: (external link)
http://dx.doi.org/10.1287/msom.2013.0470 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormsom:v:16:y:2014:i:2:p:251-262
Access Statistics for this article
More articles in Manufacturing & Service Operations Management from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().