Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems
Zümbül Atan (),
Ton de Kok (),
Nico P. Dellaert (),
Richard van Boxel () and
Fred Janssen ()
Additional contact information
Zümbül Atan: Department of Industrial Engineering and Innovation Sciences, Eindhoven University of Technology, 5600 MB, Eindhoven, Nethlerlands
Ton de Kok: Department of Industrial Engineering and Innovation Sciences, Eindhoven University of Technology, 5600 MB, Eindhoven, Nethlerlands
Nico P. Dellaert: Department of Industrial Engineering and Innovation Sciences, Eindhoven University of Technology, 5600 MB, Eindhoven, Nethlerlands
Richard van Boxel: ASML, 5504DR Veldhoven, Netherlands
Fred Janssen: ASML, 5504DR Veldhoven, Netherlands
Manufacturing & Service Operations Management, 2016, vol. 18, issue 1, 122-140
Abstract:
We study an assembly system with a number of parallel multistage processes feeding a multistage final assembly process. Each stage has a stochastic throughput time. We assume that the system is controlled by planned leadtimes at each stage. From these planned leadtimes the start and due times of all stages can be derived. If a job finishes at a particular stage and has to wait before the start of the next job(s), a holding cost proportional to the waiting time is incurred. A penalty cost proportional to the lateness is incurred when the last stage of the final assembly process finishes after its due time. The objective is to determine planned leadtimes for each individual stage, such that the expected cost of a customer order is minimized.We derive the recursive equations for the tardiness and earliness at all stages and an exact expression for the expected cost. We discuss the similarity between these expressions and those for serial inventory systems. Based on this observation and a conjecture related to the generalized Newsvendor equations, we develop an iterative heuristic procedure. Comparison with a numerical optimization method confirms the accuracy of the heuristic. Finally, we discuss an application of the model to a real-life case, showing the added value of a system-wide optimization of planned leadtimes compared to current practice.
Keywords: planned leadtimes; customer-order-driven; assembly systems (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
http://dx.doi.org/10.1287/msom.2015.0565 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormsom:v:18:y:2016:i:1:p:122-140
Access Statistics for this article
More articles in Manufacturing & Service Operations Management from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().