Expediting in Two-Echelon Spare Parts Inventory Systems
Melvin Drent () and
Joachim Arts
Additional contact information
Melvin Drent: Luxembourg Centre for Logistics and Supply Chain Management, University of Luxembourg, L-1359 Luxembourg City, Luxembourg
Manufacturing & Service Operations Management, 2021, vol. 23, issue 6, 1431-1448
Abstract:
Problem definition : We consider dual sourcing in a distribution network for spare parts consisting of one central warehouse and multiple local warehouses. Each warehouse keeps multiple types of repairable parts to maintain several types of capital goods. The repair shop at the central warehouse has two repair options for each repairable part: a regular repair option and an expedited repair option. Irrespective of the repair option, each repairable part uses a certain resource for its repair. In the design of these inventory systems, companies need to decide on stocking levels and expedite thresholds such that total stock investments are minimized while satisfying asset availability and expediting constraints. Academic/practical relevance : Although most companies have the possibility to expedite the repair of parts in short supply, no contributions have been made that incorporate such dynamic expediting policies in repairable investment decisions. Anticipating expediting decisions that will be made later leads to substantial reductions in repairable investments. Methodology : We use queueing theory to determine the performance of the central warehouse and subsequently find the performance of all local warehouses using binomial disaggregation. For the optimization problem, we develop a greedy heuristic and a decomposition and column generation based algorithm. Results : Both solution approaches perform very well with average optimality gaps of 2.38 and 0.27%, respectively, across a large test bed of industrial size. The possibility to expedite the repair of failed parts is effective in reducing stock investments with average reductions of 7.94% and even reductions up to 19.61% relative to the state of the art. Managerial implications : Based on a case study at Netherlands Railways, we show how managers can significantly reduce the investment in repairable spare parts when dynamic repair policies are leveraged to prioritize repair of parts whose inventory is critically low.
Keywords: inventory; spare parts; multi-item; repair; expediting; multi-echelon; column generation (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/msom.2020.0888 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormsom:v:23:y:2021:i:6:p:1431-1448
Access Statistics for this article
More articles in Manufacturing & Service Operations Management from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().