Conditional Lead-Time Flexibility in an Assemble-to-Order System
Yi Yu (),
Tianhu Deng () and
Jing-Sheng Song ()
Additional contact information
Yi Yu: School of Information Management and Engineering, Shanghai University of Finance and Economics, Shanghai 200433, China
Tianhu Deng: Department of Industrial Engineering, Tsinghua University, Beijing 100084, China
Jing-Sheng Song: Fuqua School of Business, Duke University, Durham, North Carolina 27708
Manufacturing & Service Operations Management, 2024, vol. 26, issue 6, 2194-2211
Abstract:
Problem definition : We introduce and formalize a concept termed conditional lead-time flexibility (CLF), which refers to the industry practice where a manufacturer requests that its upstream suppliers dynamically adjust the pipeline orders’ remaining lead times. Over a finite horizon, an assemble-to-order manufacturer makes joint decisions on inventory replenishment and lead-time adjustment to minimize the total discounted expected cost. Methodology/results : The problem is formulated as a multiperiod dynamic programming with an enlarged state space to track the adjustable pipeline orders. The replenishment and lead-time adjustment decisions are made sequentially in each period. The analysis reveals that (i) the optimal cost-to-go function is both convex and additively separable, that (ii) both the optimal replenishment and lead-time adjustment decisions follow general base-stock policies, and that (iii) the convexity and additive separability allow us to perform a derivative analysis on the optimality equations and design an efficient algorithm. Managerial implications : Using real industry data, we numerically find that (i) CLF achieves notable cost savings over a wide range of parameters, that (ii) the value of CLF comes from both the order expediting and deferring, and that (iii) CLF outperforms dual sourcing when the unit adjustment cost is less than 40% of the unit ordering cost from the express source. Our findings underscore the importance of CLF.
Keywords: conditional lead-time flexibility; assemble to order (ATO); inventory planning (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/msom.2023.0520 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormsom:v:26:y:2024:i:6:p:2194-2211
Access Statistics for this article
More articles in Manufacturing & Service Operations Management from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().