Letter to the Editor---Bibliography on Project Planning and Control by Network Analysis: 1959--1961

Clifford George Bigelow

Operations Research, 1962, vol. 10, issue 5, 728-731

Abstract: Network analysis---also known as PERT (program evaluation and review technique), PEP (program evaluation procedure), CPM (critical-path method), CPS (critical path scheduling), and arrow diagramming---for the planning and control of research and industrial projects and programs has been the subject of many published articles. The following bibliography lists the major titles, classified as to (1) basic principles, (2) industrial applications, and (3) military applications, that have appeared in over forty publications from 1959 through 1961.

Date: 1962
References: Add references at CitEc
Citations:

Downloads: (external link)
http://dx.doi.org/10.1287/opre.10.5.728 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:10:y:1962:i:5:p:728-731

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:10:y:1962:i:5:p:728-731