The Estimation of the Mean and Variance of a “PERT” Activity Time
William A. Donaldson
Additional contact information
William A. Donaldson: Department of Industrial Administration, University of Strathclyde, Glasgow, C. 1, Scotland
Operations Research, 1965, vol. 13, issue 3, 382-385
Abstract:
An alternative method of estimating the variance of a PERT activity time is proposed given that one of the initial estimates is the mean. The beta-distribution of the activity time is assumed to be tangential to the x -axis at each end. Restrictions in the current method are relaxed, and the inconsistency of the implicit assumption of a fixed coefficient of skew removed. The skew of the distribution is determined by the three estimates of the activity time. No difficult computations are involved.
Date: 1965
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.13.3.382 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:13:y:1965:i:3:p:382-385
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().