Letter to the Editor—Timing of Check Out Before a Critical Event
A. J. Truelove
Additional contact information
A. J. Truelove: C-E-I-R Inc., Beverly Hills, California
Operations Research, 1965, vol. 13, issue 6, 1036-1044
Abstract:
A system with constant failure rate must be operable at time T . Prior to this we permit only one check-out, and one repair if necessary. How far should we “back off” from T in scheduling check out? Approximate solutions are derived for exponential and log normal repair time distributions, with graphical results in the latter case.
Date: 1965
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.13.6.1036 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:13:y:1965:i:6:p:1036-1044
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().