Expected Production of a Single Repairman Machine-Maintenance System with Overnight Repairs
Ivan Elce and
Hans Liebeck
Additional contact information
Ivan Elce: University of Keele, Keele, Staffordshire, England
Hans Liebeck: University of Keele, Keele, Staffordshire, England
Operations Research, 1966, vol. 14, issue 3, 478-485
Abstract:
Assuming that the repair time and the working time of each machine is exponentially distributed, and that the system operates for a time period of given length starting with all machines in working order, an expression is found for the expected number of machine hours worked. This is proportional to the expected production of the system. The expression is complicated to evaluate, so upper and lower bounds for it are derived, which are of a simpler form.
Date: 1966
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.14.3.478 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:14:y:1966:i:3:p:478-485
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().