An Algorithm for Project (Job) Sequencing with Resource Constraints
Samuel Corenstein
Additional contact information
Samuel Corenstein: IBM Thomas J. Watson Research Center, Yorktown Heights, New York
Operations Research, 1972, vol. 20, issue 4, 835-850
Abstract:
This paper treats the problem of project (or machine) scheduling with resource constraints to achieve minimum total duration time as a disjunctive graph. The prospective advantage of this approach is the elimination of the need to consider individual time periods over the program horizon; a feasibility check determines whether the resource constraints can be met by any particular network representation of the project. The paper gives an algorithm that uses partial enumeration for what is essentially a mixed integer program. The algorithm employs a maximum-flow computation as a check for feasibility with respect to available resources.
Date: 1972
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.20.4.835 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:20:y:1972:i:4:p:835-850
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().