Errata
Donald Erlenkotter
Additional contact information
Donald Erlenkotter: University of California, Los Angeles, California
Operations Research, 1974, vol. 22, issue 1, 202-202
Abstract:
Correction to Erlenkotter, D. 1970. The sequencing of expansion projects. Western Management Science Institute Working Paper No. 166, University of California, Los Angeles, November.
Date: 1974
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.22.1.202 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:22:y:1974:i:1:p:202-202
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().