EconPapers    
Economics at your fingertips  
 

Simultaneous Price-Production Decisions

Dov Pekelman
Additional contact information
Dov Pekelman: University of Chicago, Chicago, Illinois

Operations Research, 1974, vol. 22, issue 4, 788-794

Abstract: This paper deals with the problem of determining the price and production schedule of a firm over a known horizon simultaneously when the demand parameters are time-dependent. It characterizes the optimal solution and shows the similarity of our problem to the well known problem of Modigliani and Hohn [ Econometrica 23, 46–66 (1955)]. It also demonstrates the possible existence of a planning horizon. These results are obtained by using control theory, in particular, by using the necessary and sufficient conditions for a state constraint in the form of a nonnegative constraint on the inventory level.

Date: 1974
References: Add references at CitEc
Citations: View citations in EconPapers (24)

Downloads: (external link)
http://dx.doi.org/10.1287/opre.22.4.788 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:22:y:1974:i:4:p:788-794

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:22:y:1974:i:4:p:788-794