Manpower Planning with Uncertain Requirements
Richard C. Grinold
Additional contact information
Richard C. Grinold: University of California, Berkeley, California
Operations Research, 1976, vol. 24, issue 3, 387-399
Abstract:
This paper examines a longitudinal model of a manpower system. The demand for effective manpower is determined by the state of a finite Markov chain. There are delays in training effective manpower, and effective manpower is an input to the training process. Thus it is not always available to meet demand. We present an operational method for calculating optimal accession policies. This calculation can in turn be used to find the equilibrium operating rules for the system. The model is a useful device for measuring the impact of alternate assumptions about continuation rates, manpower utilization policies, demand levels, and transition probabilities in the demand process.
Date: 1976
References: Add references at CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.24.3.387 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:24:y:1976:i:3:p:387-399
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().