Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/ LP Approach
A. M. Geoffrion and
G. W. Graves
Additional contact information
A. M. Geoffrion: University of California, Los Angeles, California
G. W. Graves: University of California, Los Angeles, California
Operations Research, 1976, vol. 24, issue 4, 595-610
Abstract:
Production orders for a number of products must be scheduled on a number of similar production lines so as to minimize the sum of product-dependent changeover costs, production costs, and time-constraint penalties. We treat the problem by a quadratic assignment algorithm with a linear programming adjustment, and describe a successful practical application for chemical reactor scheduling.
Date: 1976
References: Add references at CitEc
Citations: View citations in EconPapers (21)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.24.4.595 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:24:y:1976:i:4:p:595-610
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().