EconPapers    
Economics at your fingertips  
 

Evaluation of Proposed Storage Sites

Ralph L. Keeney
Additional contact information
Ralph L. Keeney: Woodward-Clyde Consultants, San Francisco, California

Operations Research, 1979, vol. 27, issue 1, 48-64

Abstract: Screening models and on-site visits by a team composed of engineers, geologists, and biologists were used to identify ten sites in the Southwest suitable for developing a pumped storage facility with a 600 MW capacity. This paper discusses the decision analysis used to rank the sites. The study included the consideration of economic, environmental, and technological concerns relating to the sites and their required transmission lines. Using sensitivity analyses, we identified factors critical to the ranking.

Date: 1979
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://dx.doi.org/10.1287/opre.27.1.48 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:27:y:1979:i:1:p:48-64

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:27:y:1979:i:1:p:48-64