Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
C. N. Potts
Additional contact information
C. N. Potts: University of Keele, England
Operations Research, 1980, vol. 28, issue 6, 1436-1441
Abstract:
The single machine sequencing problem is considered in which each job has a release date, a processing time and a delivery time. The objective is to find a sequence of jobs which minimizes the time by which all jobs are delivered. A heuristic is presented which never deviates by more than 50% from the optimum.
Date: 1980
References: Add references at CitEc
Citations: View citations in EconPapers (35)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.28.6.1436 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:28:y:1980:i:6:p:1436-1441
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().