Solving an Electricity Generating Capacity Expansion Planning Problem by Generalized Benders' Decomposition
Jeremy A. Bloom
Additional contact information
Jeremy A. Bloom: General Public Utilities Service Corporation, Parsippany, New Jersey
Operations Research, 1983, vol. 31, issue 1, 84-100
Abstract:
This paper discusses application of generalized Benders' decomposition in a model for planning least-cost investments in electricity generating capacity subject to probabilistic reliability constraints. The planning problem is decomposed into a set of subproblems, each representing the operation of a set of generating plants of fixed capacity in 1 year, and a master problem, representing optimal capacity investments over the entire planning horizon. The subproblems are solved using a procedure called probabilistic simulation, which calculates the expected cost of operating the generating system, the reliability level, and dual multipliers reflecting the value of small changes in the plant capacities. The master problem is a linear program which uses these dual multipliers to approximate the nonlinear cost and reliability functions. The solution to the capacity expansion problem is found by iteratively solving the master problem and the subproblems.
Keywords: 297; 473 electric power generation planning; 649 generalized Benders' decomposition (search for similar items in EconPapers)
Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (22)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.31.1.84 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:31:y:1983:i:1:p:84-100
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().