Dynamics of the M / G /1 Vacation Model
J. Keilson and
L. D. Servi
Additional contact information
J. Keilson: University of Rochester, Rochester, New York
L. D. Servi: GTE Laboratories, Waltham, Massachusetts
Operations Research, 1987, vol. 35, issue 4, 575-582
Abstract:
An M / G /1 processor schedule attends to auxiliary vacation tasks iteratively. We describe the influence of these tasks on the dynamic behavior of the system and obtain, for several cases of interest, the relaxation time of the vacation system required to validate steady-state approximations. Finally, we find the distribution of the duration of the primary busy period, the vacation busy period, and an associated cycle time.
Keywords: 681 vacation models; 704 relaxation times (search for similar items in EconPapers)
Date: 1987
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.35.4.575 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:35:y:1987:i:4:p:575-582
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().