Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines
Oded Z. Maimon and
Stanley B. Gershwin
Additional contact information
Oded Z. Maimon: Tel Aviv University, Tel Aviv, Israel
Stanley B. Gershwin: Massachusetts Institute of Technology, Cambridge, Massachusetts
Operations Research, 1988, vol. 36, issue 2, 279-292
Abstract:
This paper presents a method for real-time scheduling and routing of material in a Flexible Manufacturing System (FMS). It extends the earlier scheduling work of Kimemia and Gershwin in which the FMS model includes machines that fail at random times and stay down for random lengths of time. The new element is the capability of different machines to perform some of the same operations. The times that different machines require to perform the same operation may differ. This paper includes a model, its analysis, a real-time algorithm, and examples.
Keywords: 111 dynamic programming; 331 inventory and production; 581 production and scheduling (search for similar items in EconPapers)
Date: 1988
References: Add references at CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.36.2.279 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:36:y:1988:i:2:p:279-292
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().