Estimating Average Production Intervals Using Inventory Measurements: Little's Law for Partially Observable Processes
Ardavan Nozari and
Ward Whitt
Additional contact information
Ardavan Nozari: Salomon Brothers, New York, New York
Ward Whitt: AT&T Bell Laboratories, Murray Hill, New Jersey
Operations Research, 1988, vol. 36, issue 2, 308-323
Abstract:
This paper proposes an indirect approach to estimate average production intervals (the length of time between starting and finishing work on each product) using work-in-process inventory measurements. The idea is to apply a modified version of Little's law ( L = λ W ) from queueing theory to cope with stochastic processes that are not directly observable. When the actual amount of completed product to be produced from the current work-in-process is not known, we suggest working with an appropriate expected amount of completed product associated with current work-in-process, taking care to properly account for such features as partial yields, changing lot sizes and reconstituted lots. This indirect estimation procedure can be applied to computer simulation as well as direct system measurement. The approach also can be used to calculate expected values of steady-state random variables in mathematical models.
Keywords: 345 estimating average production intervals; 681 conservation laws; 799 indirect estimation via Little's law (search for similar items in EconPapers)
Date: 1988
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.36.2.308 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:36:y:1988:i:2:p:308-323
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().