EconPapers    
Economics at your fingertips  
 

The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups

Gregory Dobson
Additional contact information
Gregory Dobson: University of Rochester, Rochester, New York

Operations Research, 1992, vol. 40, issue 4, 736-749

Abstract: In this paper, we formulate the cyclic lot scheduling problem on a single facility with sequence-dependent setup costs and times and provide a heuristic solution procedure. A Lagrangian relaxation of the formulation leads to a partial separation of the embedded lot sizing and traveling salesman problems. The relaxation results in a new combinatorial problem related to the minimum spanning tree problem. The information about frequency of production, gained from the solution to this relaxation, is used to find heuristic solutions for the entire problem. Computational work on randomly generated problems shows that the problem becomes more difficult as the diversity in the sequence-dependent parameters increases.

Keywords: manufacturing; performance/productivity: cyclic lot scheduling with sequence-dependent setups; production/scheduling; sequencing; deterministic: batching with sequence-dependent setups (search for similar items in EconPapers)
Date: 1992
References: Add references at CitEc
Citations: View citations in EconPapers (16)

Downloads: (external link)
http://dx.doi.org/10.1287/opre.40.4.736 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:40:y:1992:i:4:p:736-749

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:40:y:1992:i:4:p:736-749