Activity Delay in Stochastic Project Networks
Arnold H. Buss and
Meir J. Rosenblatt
Additional contact information
Arnold H. Buss: Naval Postgraduate School, Monterey, California
Meir J. Rosenblatt: Technion-Israel Institute of Technology, Haifa, Israel Washington University, St. Louis, Missouri
Operations Research, 1997, vol. 45, issue 1, 126-139
Abstract:
In this paper we deal with a stochastic project network and consider the impact of activity delay to maximize the expected present value of a project. It is shown that in certain situations, delaying the onset of an activity from its earliest start time can indeed increase the present value of a project due to the postponing of associated negative cash flows. Furthermore, a project that could otherwise be rejected (negative expected present value) may become profitable (positive expected present value) due to delay. We demonstrate that even activities on the critical path, as determined by each activity's expected duration, may be profitably delayed. Optimal and approximate procedures are developed to determine the amount of delay of the various activities.
Keywords: project; management (search for similar items in EconPapers)
Date: 1997
References: Add references at CitEc
Citations: View citations in EconPapers (25)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.45.1.126 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:45:y:1997:i:1:p:126-139
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().