Abstract:
According to recent figures published by the U.S. Department of Commerce, approximately $28 billion were invested in new facilities and equipment by industries in this country during the year 1955. This large expenditure undoubtedly reflects the need for increased output in this country's rapidly expanding economy. But how have decisions been made in arriving at the amount and distribution of this additional productive effort? What proportion of this vast sum can be attributed to decisions based on intuition, judgment, and hunches? To what extent have expenditures been based upon sound scientific analysis? A great deal of inefficiency and waste of resources could certainly be avoided if management were to employ the many scientific techniques and tools that are currently available. In particular, waiting-line theory can be used to determine how many facilities one ought to have in a process or system for which output requirements can be specified. However, the theory has general applicability to a wide variety of problems not only in production areas but also in many other situations where service facilities of one kind or another must be coordinated with demands for service.
Date: 1956
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.4.2.221 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:4:y:1956:i:2:p:221-231
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().