Three Applications of Operations Research in a Large Electric Utility
P. J. Sandiford,
B. Bernholtz and
W. Shelson
Additional contact information
P. J. Sandiford: The Hydro-Electric Power Commission of Ontario, Toronto, Ontario
B. Bernholtz: The Hydro-Electric Power Commission of Ontario, Toronto, Ontario
W. Shelson: The Hydro-Electric Power Commission of Ontario, Toronto, Ontario
Operations Research, 1956, vol. 4, issue 6, 663-673
Abstract:
The studies described are (1) the development of a “self-correcting” system for estimating, up to twelve months in advance, the future monthly mean levels of Lake Erie, which control the flow available for power generation at Niagara Falls, (2) the development of a system for forecasting daily peak loads up to twenty-four hours in advance, based on a new model of load behavior, whose input is a normal weather forecast and whose output has a median error of less than 1 per cent, (3) the development of a method for determining the optimum replacement point for trucks in a large fleet under changing economic conditions.
Date: 1956
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.4.6.663 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:4:y:1956:i:6:p:663-673
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().