Use of Transfer Functions for Company Planning
Gordon K. Johnson and 
Inez M. Turner
Additional contact information 
Gordon K. Johnson: Minneapolis-Honeywell Regulator Company, Minneapolis, Minnesota
Inez M. Turner: Minneapolis-Honeywell Regulator Company, Minneapolis, Minnesota
Operations Research, 1956, vol. 4, issue 6, 705-710
Abstract:
In the aeronautical industry as in other manufacturing industries, one of the problems associated with planning an engineering program is to determine the amount and timing of engineering effort needed to support the sales forecast. In an effort to understand this problem better, a study was made of the relation of engineering effort to sales. It was found that this problem was analogous to that of a servomechanism system for which mathematical techniques have been developed and applied successfully. The study resulted in the development of a “transfer-function” formula which has proved to be a useful tool for measuring the relation between engineering effort and sales. The method employed to obtain the transfer function and the results obtained by its use are presented herein.
Date: 1956
References: Add references at CitEc 
Citations: 
Downloads: (external link)
http://dx.doi.org/10.1287/opre.4.6.705 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX 
RIS (EndNote, ProCite, RefMan) 
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:4:y:1956:i:6:p:705-710
Access Statistics for this article
More articles in Operations Research  from  INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().