Order Assignment and Scheduling in a Supply Chain
Zhi-Long Chen () and
Guruprasad Pundoor ()
Additional contact information
Zhi-Long Chen: Department of Decision and Information Technologies, Robert H. Smith School of Business, University of Maryland, College Park, Maryland 20742-1815
Guruprasad Pundoor: FedEx Express, 3680 Hacks Cross Road, Building H, Memphis, Tennessee 38125
Operations Research, 2006, vol. 54, issue 3, 555-572
Abstract:
We consider the supply chain of a manufacturer who produces time-sensitive products that have a large variety, a short life cycle, and are sold in a very short selling season. The supply chain consists of multiple overseas plants and a domestic distribution center (DC). Retail orders are first processed at the plants and then shipped from the plants to the DC for distribution to domestic retailers. Due to variations in productivity and labor costs at different plants, the processing time and cost of an order are dependent on the plant to which it is assigned. We study the following static and deterministic order assignment and scheduling problem faced by the manufacturer before every selling season: Given a set of orders, determine which orders are to be assigned to each plant, find a schedule for processing the assigned orders at each plant, and find a schedule for shipping the completed orders from each plant to the DC, such that a certain performance measure is optimized. We consider four different performance measures, all of which take into account both delivery lead time and the total production and distribution cost. A problem corresponding to each performance measure is studied separately. We analyze the computational complexity of various cases of the problems by either proving that a problem is intractable or providing an efficient exact algorithm for the problem. We propose several fast heuristics for the intractable problems. We analyze the worst-case and asymptotic performance of the heuristics and also computationally evaluate their performance using randomly generated test instances. Our results show that the heuristics are capable of generating near-optimal solutions quickly.
Keywords: production/scheduling; approximation/heuristic; deterministic sequencing; manufacturing; performance/productivity; transportation; scheduling; programming; integer; algorithms; heuristic (search for similar items in EconPapers)
Date: 2006
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (41)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.1060.0280 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:54:y:2006:i:3:p:555-572
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().