EconPapers    
Economics at your fingertips  
 

On the Performance of Sparse Process Structures in Partial Postponement Production Systems

Mabel C. Chou (), Geoffrey A. Chua () and Huan Zheng ()
Additional contact information
Mabel C. Chou: National University of Singapore Business School, Singapore 119077, Singapore
Geoffrey A. Chua: Nanyang Business School, Nanyang Technological University, Singapore 639798, Singapore
Huan Zheng: Antai College of Economics and Management, Shanghai Jiaotong University, Shanghai 200052, China

Operations Research, 2014, vol. 62, issue 2, 348-365

Abstract: Production postponement, the strategy to hold reserved production capacity that can be deployed based on actual demand signals, is often used to mitigate supply-demand mismatch risk. The effectiveness of this strategy depends crucially on the ease, or flexibility, in deploying the reserved capacity to meet product demands. Existing literature assumes that the reserved capacity is fully flexible, i.e., capable of being deployed to meet the demand of any item in a multiproduct system. Little is known if reserved capacity is held at many different locations, with each location having only a limited range of flexibility on production options. This paper examines how effective the production postponement strategy is in this environment.When the amount of reserved capacity is small (i.e., postponement level near 0%), no amount of flexibility can reap significant benefits. When the reserved capacity is high (i.e., postponement level near 100%), it is well known that a sparse structure such as a 2-chain can perform nearly as well as a fully flexible structure. Hence, process flexibility beyond 2-chain has little impact on the effectiveness of production postponement strategy in these two extreme environments. Interestingly, in a symmetric system, we prove that the performance of 2-chain, vis-à-vis the full flexibility structure, has a wider gap when postponement level (i.e., amount of reserved capacity) is moderate, and thus process flexibility beyond 2-chain matters and affects appreciably the performance of the production postponement strategy. Fortunately, adding a little more flexibility, say turning a 2-chain into a 3-chain, the system can perform almost as well as a full flexibility structure for all postponement levels. This is important as first stage production capacity can be allocated as if the reserve capacity is fully flexible. Our analysis hinges on an exact analytical expression for the performance of d -chain, obtained from solving a related class of random walk problems. To the best of our knowledge, this is the first paper with analytical results on the performance of d -chain for d > 2.

Keywords: process flexibility; production postponement; chaining strategy; multi-item newsvendor; stochastic programming (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
http://dx.doi.org/10.1287/opre.2013.1255 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:62:y:2014:i:2:p:348-365

Access Statistics for this article

More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:oropre:v:62:y:2014:i:2:p:348-365