Managing Underperformance Risk in Project Portfolio Selection
Nicholas G. Hall (),
Daniel Zhuoyu Long (),
Jin Qi () and
Melvyn Sim ()
Additional contact information
Nicholas G. Hall: Department of Management Sciences, Fisher College of Business, The Ohio State University, Columbus, Ohio 43210
Daniel Zhuoyu Long: Department of Systems Engineering and Engineering Management, Chinese University of Hong Kong, Hong Kong
Jin Qi: Department of Industrial Engineering and Logistics Management, Hong Kong University of Science and Technology, Hong Kong
Melvyn Sim: Department of Decision Sciences, NUS Business School, National University of Singapore, Singapore 119077
Operations Research, 2015, vol. 63, issue 3, 660-675
Abstract:
We consider a project selection problem where each project has an uncertain return with partially characterized probability distribution. The decision maker selects a feasible subset of projects so that the risk of the portfolio return not meeting a specified target is minimized. To model and evaluate this risk, we propose and justify a general performance measure, the underperformance riskiness index (URI). We define a special case of the URI, the entropic underperformance riskiness index (EURI), for the project selection problem. We minimize the EURI of the project portfolio, which is the reciprocal of the absolute risk aversion (ARA) of an ambiguity-averse individual with constant ARA who is indifferent between the target return with certainty and the uncertain portfolio return. The EURI extends the riskiness index of Aumann and Serrano (2008) by incorporating the target and distributional ambiguity, and controls the underperformance probability (UP) for any target level. Our model includes correlation and interaction effects such as synergies. Since the model is a discrete nonlinear optimization problem, we derive the optimal solution using Benders decomposition techniques. We show that computationally efficient solution of the model is possible. Furthermore, the project portfolios generated by minimizing the underperformance risk are more than competitive in achieving the target with those found by benchmark approaches, including maximization of expected return, minimization of UP, mean-variance analysis, and maximization of Roy’s safety-first ratio (1952). When there is only a single constraint for the budget, we describe a heuristic which routinely provides project portfolios with near-optimal underperformance risk.
Keywords: project management; decision analysis; risk; programming; stochastic; integer (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (22)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.2015.1382 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:63:y:2015:i:3:p:660-675
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().