The Scheduling of a Barge Line
George G. O'Brien and
Roger R. Crane
Additional contact information
George G. O'Brien: Melpar, Alexandria, Virginia
Roger R. Crane: Melpar, Alexandria, Virginia
Operations Research, 1959, vol. 7, issue 5, 561-570
Abstract:
This paper is the case history of an operations-research study of a barge line undertaken in the summer of 1954. One problem considered was the scheduling of tugs and the determination of the resulting number of barge loads per year which would result. The second problem was to determine the proper balance between tugs and barges for three or four tugs. These problems were solved by simulating the operation, the results of the simulation led to recommendations and predictions. These predictions are compared to the actual data over the ensuing years as the recommendations were carried out.
Date: 1959
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://dx.doi.org/10.1287/opre.7.5.561 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:7:y:1959:i:5:p:561-570
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().