Letter to the Editor---Failure Testing in Preventive Maintenance
Harold Greenberg
Additional contact information
Harold Greenberg: RCA Surface Communications Systems Laboratories, New York, New York
Operations Research, 1960, vol. 8, issue 3, 406-407
Abstract:
A proper rejection of the faulty components may be made when the probability of failure of the component is known, together with auxiliary information from test equipment having known accuracy. It is then possible to develop a schedule to reject components and maintain a high percentage of operating time.
Date: 1960
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.8.3.406 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:8:y:1960:i:3:p:406-407
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().