Allocating for Acceptable Risk Instead of Expected Value
William S. Bennett
Additional contact information
William S. Bennett: Operations Research Office, The Johns Hopkins University, Bethesda, Maryland
Operations Research, 1961, vol. 9, issue 2, 163-168
Abstract:
Allocation of inventory, spares, or redundancy in reliable systems often seeks to maximize expected orders filled or hours until failure (assuming known distributions). Often there is no opportunity for an averaging process to permit this expectation to materialize. Each operation of the system may be critical, instead of the average of many, or the first shortage may terminate the whole operation. Predictable adequacy of each operation is attained by considering the full distribution, e.g., of operating hours before failure, instead of just the mean (expected) value. Distributions with small standard deviations permit more precise prediction of probable time before failure (shortage). Plans based on marginal utility concepts tend to avoid the expected-value trap but do not necessarily minimize the appropriate risk of shortage. Operating characteristic curves, like those used in quality control, allow intelligent consideration of the risks involved in choosing among alternate allocation plans. Allocation of a small number of stock items is used to illustrate the criterion.
Date: 1961
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/opre.9.2.163 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:oropre:v:9:y:1961:i:2:p:163-168
Access Statistics for this article
More articles in Operations Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().