Ship Congestion at a Scheduled Draw Bridge
J. van Daal and
F. van Doeland
Additional contact information
J. van Daal: Erasmus University Rotterdam, Rotterdam, Holland
F. van Doeland: Erasmus University Rotterdam, Rotterdam, Holland
Transportation Science, 1974, vol. 8, issue 1, 24-34
Abstract:
The railway bridge at Dordrecht (Holland) can be raised to let big ships pass through. This takes place according to a fixed daily time schedule derived from the railway timetable. The waiting times of the ships depend on the number and the duration of these openings, the headway of the unraised bridge (changing on account of tidal effects), and the traffic supply. In this paper the dependence of the waiting times on the above-mentioned factors is quantified by means of a Monte Carlo simulation procedure.
Date: 1974
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/trsc.8.1.24 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ortrsc:v:8:y:1974:i:1:p:24-34
Access Statistics for this article
More articles in Transportation Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().