Combining Private and Public Resources: Captive Power Plants and Electricity Sector Development in Bangladesh
Sakib Amin,
Tooraj Jamasb,
Manuel Llorca,
Laura Marsiliani and
Thomas I. Renström
Emerging Markets Finance and Trade, 2021, vol. 57, issue 14, 3891-3912
Abstract:
Developing economies need to efficiently utilize both public and private resources to develop their energy sectors. The opportunity cost of failing to do so is high. This article uses a Dynamic Stochastic General Equilibrium (DSGE) approach to assess the integration of the Captive Power Plants (CPPs) in the power sector of Bangladesh. We find that if Bangladesh shut down the CPPs, the long-run industrial output and GDP would fall by 1.5% and 1.2%, respectively. The Impulse Response Functions (IRFs) show that the Bangladesh economy would be more vulnerable to oil price shocks without CPPs. In order to minimize distortion in the energy markets, the government could instead consider alternative reforms such as promoting the use of efficient production technologies or the replacement of fossil fuels with renewable energy sources.
Date: 2021
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/1540496X.2019.1703107 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:mes:emfitr:v:57:y:2021:i:14:p:3891-3912
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/MREE20
DOI: 10.1080/1540496X.2019.1703107
Access Statistics for this article
More articles in Emerging Markets Finance and Trade from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().