Global fusion plans face three-year delay
Alison Abbott
Nature, 1997, vol. 387, issue 6635, 746-746
Abstract:
[MUNICH]A decision to construct a multibillion dollar international facility to test the feasibility of nuclear fusion as a future energy source is almost certain to be delayed by three years.
Date: 1997
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.nature.com/articles/42769 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:nat:nature:v:387:y:1997:i:6635:d:10.1038_42769
Ordering information: This journal article can be ordered from
https://www.nature.com/
DOI: 10.1038/42769
Access Statistics for this article
Nature is currently edited by Magdalena Skipper
More articles in Nature from Nature
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().